sedance.appOpen studio

Status

Measured from our own generations over the last 24 hours — not a vendor’s figures, and not an uptime badge that only ever reads green. Where a model has run no jobs in the window, we say so rather than filling the cell.

ModelJobs (24h)Successp50p95Expected p50
Seedance 2.50no data210s
Seedance 2.0 4K0no data180s
Seedance 2.010%95s
Seedance 2.0 Fast0no data55s
Seedance 2.0 Mini0no data40s
Seedance 1.5 Pro0no data45s

“Expected p50” is the figure in our model registry, which drives polling schedules and the wait estimate in the studio. Where the measured column drifts away from it, the registry is what gets corrected.